Projects Detail

.LOS ANGELES, CA - OCTOBER 4, 2021 --The Intermodal Transportation Facility – West (ITF-West) is Los Angeles International Airport’s (LAX) new approximately 4,300 stall parking structure, which will be located between Westchester Parkway and 96th Street. The facility will provide drop-off/pick-up locations and short and long-term parking options. The four-story parking structure will be the first component of LAX’s $5.5 billion Landside Access Modernization Program (LAMP) to be completed and will open in 2021, giving travelers an alternative option to driving into the Central Terminal Area when LAX is at the height of construction. Once completed, it will be more than just a parking structure – it will be the new front door to LAX - with an express link to the terminal area via the Automated People Mover (APM) train, which will open in 2023...The ITF-West will feature meet & greet space, valet parking, the potential for up to 5,000 square feet of concession space, Wi-Fi, and direct connection to an APM station. From 2021 to 2023, a shuttle will provide transportation to and from the Central Terminal Area...The 1.7 million square foot facility will also house Los Angeles World Airport’s (LAWA) Security & Badging Office (SBO), which is currently located off World Way West and Pershing Avenue. By moving the SBO into the ITF-West, the over 55,000 badged employees who work at the airport will now be able to take care of their badging needs in a centralized location. (Photo By Joshua Sudock)../// ADDITIONAL INFORMATION -- SLUG: ITFW.LAX.10042021_JS -- Photograph made Monday, October 4, 2021.

Intermodal Transportation Facility (itf) West

Market: Aviation
Owner: Los Angeles World Airports (LAWA)
Delivery method: Design-Build

Project Details: The ITF-West is LAX’s new approximately 4,300 stall parking structure, which will be located between Westchester Parkway and 96th Street. The facility will provide drop-off/pick-up locations and short- and long-term parking options. The four-story parking structure is the first component of the $5.5 billion LAMP program to be completed, opening in 2021. It will feature meet & greet space, valet parking, the potential for up to 5,000 square feet of concession space, Wi-Fi, and direct connection to an APM station. The 1.7 million square foot facility will also house LAWA’s Security & Badging Office to a central location.

Scope of work:
• Quality Program Management support

Success Story: A1MI was engaged to help the contractor achieve approval for their testing matrix. After several attempts by the contractor to work with LAWA to write a successful plan, it was suggested that the contractor engage A1MI to assist with this process. The A1MI team was engaged and had a new testing plan and matrix written and submitted to the contractor within a week. LAWA returned only three minor comments, which were resolved within a day, and the plan was approved, allowing construction to continue.


By browsing this website, you agree to our privacy policy.
I Agree